{"id":56,"date":"2013-01-20T23:13:33","date_gmt":"2013-01-20T20:13:33","guid":{"rendered":"http:\/\/www.nextgensolar.net\/?p=56"},"modified":"2014-05-06T00:38:59","modified_gmt":"2014-05-05T21:38:59","slug":"power-purchase-agreement-signed","status":"publish","type":"post","link":"http:\/\/www.nextgensolar.net\/?p=56","title":{"rendered":"Signed: Power Purchase Agreement"},"content":{"rendered":"<p><img loading=\"lazy\" class=\"alignleft\" style=\"font-size: 0.95em; line-height: 1.6em;\" src=\"https:\/\/encrypted-tbn2.gstatic.com\/images?q=tbn:ANd9GcR7MbkOj_J2mwkaz84ysd8sqZbV7I6BPBZ5DpxDIWrIjih1Y0j7\" alt=\"\" width=\"92\" height=\"92\" \/><\/p>\n<p style=\"text-align: justify;\">The Power Purchase Agreement has been signed with <strong>Tanzania National Electric Supply Company (TANESCO)<\/strong> for the Kigoma solar power plant.<\/p>\n<p style=\"text-align: justify;\">Initially, NextGen Solar will be setting up a 3 MW generation capacity connected to the isolated mini-grid at Kigoma which will be expanded to 5 MW based on the incremental demand characteristics.<\/p>\n<p style=\"text-align: justify;\"><a href=\"http:\/\/www.tanesco.co.tz\/\">http:\/\/www.tanesco.co.tz\/<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Power Purchase Agreement has been signed with Tanzania National Electric Supply Company (TANESCO) for the Kigoma solar power plant. Initially, NextGen Solar will be setting up a 3 MW generation capacity connected to the<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[3],"tags":[],"_links":{"self":[{"href":"http:\/\/www.nextgensolar.net\/index.php?rest_route=\/wp\/v2\/posts\/56"}],"collection":[{"href":"http:\/\/www.nextgensolar.net\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.nextgensolar.net\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.nextgensolar.net\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.nextgensolar.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=56"}],"version-history":[{"count":10,"href":"http:\/\/www.nextgensolar.net\/index.php?rest_route=\/wp\/v2\/posts\/56\/revisions"}],"predecessor-version":[{"id":201,"href":"http:\/\/www.nextgensolar.net\/index.php?rest_route=\/wp\/v2\/posts\/56\/revisions\/201"}],"wp:attachment":[{"href":"http:\/\/www.nextgensolar.net\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=56"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.nextgensolar.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=56"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.nextgensolar.net\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=56"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}